The pilot involves three public buildings, the first one hosting Municipality offices, the second one dedicated to the Nursery and Primary School.
The first building has three floors with a surface of about 400 m2. In this first building there are 15 rooms using approximately 40 luminaries.
The second building has two floors with a surface of about 2000 m2, with 46 rooms using approximately 260 luminaries.
The annual number of users attending the Pilot areas is estimated in about 2.500 units.
The total annual energy consumption is about 3000 €/year and about 20 MW/year.
On the roof of this building is installed a PV system, grid-connected type, composed by 144 modules over a surface of 233 m2, with an annual energy production of 43301 KW.
The Pilot should include about 3CPC, 20 RS and a number and typology of sensors that depends on the results of the pilot feasibility study.



Summary of Pilot features
Pilot Location Lettomanoppello
Country Italy
Building typology

Municipal Offices, Nursery and Primary School

Buildings involved 2
Rooms involved 87
Surface (m2) 2.400
Lighting points involved 387

User attending the Pilot areas (annual estime)

Presence of PV Y/N Y
Annual energy consumption (€) 3.000
Annual electricity consumption (MWatt)  20
Annual CO2 emission (Kg) 20.000
Relative energy cost saving using actual local energy price (€) 1.800